Hubbell Kellems ROUGH-IN READY Prefabricated Wiring Systems

Prefabricated Solutions for Rough-in Ready® Electrical Installations

Hubbell Wiring Device-Kellems Rough-in Ready® is a pre-engineered and preassembled NEC compliant and UL Listed electrical wiring system with custom-made components for branch circuit installations of virtually any size. Rough-in Ready® can be configured for new construction and retrofitting electrical installations.

Best Applications
  • Healthcare: Hospitals, Healthcare Facilities, and Assisted Living Homes
  • Hospitality: Hotels, Motels, Resorts, Casinos, and Conference Centers
  • Housing: Apartments, Condominiums, and Campus Housing

Hubbell’s Rough-in Ready® system of prefabricated electrical support products is suited for projects requiring repetitive wiring installation. All prefabricated assemblies and cables are labeled to match a detailed layout drawing. Rough-in Ready® provides the biggest benefit to the installer for projects with many similar rooms.

Steiner application specialists can help you select the correct prefabricated solutions based on your project specs and drawings. Call 1-800-STEINER (783-4637) for assistance.

Download PDF
Hubbell Kellems ROUGH-IN READY Divider

Rough-in Ready® Products Include

  • Complete Rough-in Ready® Systems designed specifically to your plans and ready to install.
  • Cable-Ready Systems – similar to Rough-in Ready’s Complete System but without cabling.
  • Custom PreFab Assemblies.
  • PreFab Components: stud brackets, cable supports, and deck hangers.

Job Cost Savings

Potential Advantage on Bid Day Calculator

Job Cost Using Rough-in Ready® Job Cost Hardwiring Same Openings
$69,832.00 Rough-in Ready® System Cost $36,789.43 Estimated Material Cost
401.29 Projected Installation Hours 2,205.70 Estimated Installation Hours
45.00 Contractor’s Fully Burdened Labor Rate 45.00 Contractor’s Fully Burdened Labor Rate
$87,889.00 Total Installed Job Cost $136,045.93 Total Installed Job Cost

Total Savings

Total Hours Saved: 1,804.41

Total Labor Saving: 81.81%

Total Job Cost Savings or Your Potential Advantage on Bid Day: $48,155.97

Total Percentage of Job Cost Savings: 35.40%